Coordination of long-lead materials allows for fast-tracked delivery.
Beacon Offshore Energy moved their local office into a new commercial office building. DonahueFavret’s challenge was completing the build-out in only 60 days. The modular wall system was a long-lead item which drove the schedule based upon its delivery. The 13,800 SF build-out was required to be complete by the end of December 2019 for operational purposes. The short time frame presented a large challenge for design, permitting, and construction to occur. Planning efforts included designing for future growth.
Square Footage
13,800 SF
Completion
60 days (2019)
Owner
Beacon Offshore Energy
Architect
Project Location
Covington, LA